fbpx

Business Park South

As part of a thriving airport community at the heart of a resurgent Tees Valley, the business park will secure additional investment and establish a vibrant commercial centre.

Land ownership includes significant areas to the north and south, totalling 2.8million sq ft for development relating to manufacturing, logistics and warehouse facilities. Work is now under way to transform this unique space into an agile and leading home for business, with the first phase designated for speculative development.

Running parallel to the runway, Business Park South is primed for immediate development and includes plans for high-quality offices and Grade A industrial units.

A new 1.5km link road is already under construction, connecting the business park directly to the A67. This will be followed by four new premises along the central boulevard, with the ability to split into as many as ten smaller units, covering up to 130,000 sq ft. Subsequent phases will see plots between one and 200 acres developed depending on business needs.

  • 270 acres of developable land at Business Park South
  • 12,079m² floor area for Phase 1A
  • Grade A industrial units
  • A new 1.5km link road connects directly to the A67
  • All new properties developed to BREEAM Excellent

Teesside International Airport Masterplan

Area Schedule (GIA Phase 1A)

NameArea (m2)Area (sq ft)
Unit A11,44915,000
Unit A21,44915,000
A2,88930,000
Unit B14845,000
Unit B24855,000
Unit B34855,000
Unit B44855,000
B1,94020,000
Unit C12,86730,000
Unit C22,86730,000
C5,73460,000
Unit D196815,000
Unit D296415,000
D1,93230,000
TOTAL12,505140,000

Phase 1A will be available by way of a traditional letting. Phase 1B will be available by way of either a Design & Build Solution or a Ground Rent. The Masterplan will be available by way of either a Design & Build Solution or a Ground Rent. This can be adapted to suit individual business needs.

Teesside International Airport Business Park Masterplan Phase 2

Indicative Accommodation Schedule

NameArea (m2)Area (sq ft)
PHASE 1B
Unit E123,232250,000
Unit E24,64550,000
Unit F23,226250,000
MASTER PLAN
Unit G46,451500,000
Unit H9,290100,000
Unit I23,226250,000
Unit J9,290100,000
Unit K9,290100,000
Unit L19,290100,000
Unit L29,290100,000
Unit M13,935150,000
Unit N9,290100,000
Unit O9,290100,000
Unit P23,226250,000
Unit Q113,935150,000
Unit Q213,935150,000
TOTAL262,9222,800,000